10 JUL 2026 - Back up to full speed! Let's be honest: for the last few months, TorrentFunk was painfully slow. Pages crawled, searches dragged, and just loading the site tested everyone's patience. We hunted the problem down to our network and rebuilt it from the ground up — smarter caching, a much bigger and faster connection, and a lot of fine-tuning under the hood. The difference is night and day: the site now loads in a fraction of a second. No more waiting around. Thanks for sticking with us through the slow spell. Now go discover your funk!
TORRENT DETAILS
JCT Standard Building Contract With Quantities 2016 (SBC-Q 2016)
The JCT Standard Building Contract is designed for large or complex construction projects where detailed contract provisions are needed. Standard Building Contracts are suitable for projects procured via the traditional or conventional method.
Features of projects using the Standard Building Contract:
The employer is responsible for the design, and this is usually supplied to the contractor by the architect or design team working on the employer?s behalf. However, Standard Building Contracts also have optional provision for a ?Contractor?s Designed Portion?, if the appointed contractor is to be responsible for the design of specific parts of the works.
Depending on the type of Standard Building Contract used, the employer (through its advisers) will need to provide drawings and specifications, works schedules or bills of quantities to specify the quantity and quality of work at tender stage.
Standard Building Contracts are normally administered either by the architect, quantity surveyor, or a contract administrator.
Works can be carried out in sections.
MAY BE USED WHERE:
The employer must provide drawings and bills of quantities to specify the quantity and quality of work.
The price and payment structure of the contract is based on a lump sum with monthly interim payments.
Sub-Contractors can be appointed with written permission of the architect/contract administrator or selected from a list of three names.
Provisions are included for collaborative working, sustainability, advance payment,?bonds (advance payment, off-site materials, retention),?third party rights and collateral warranties, and named specialists
Pre-Construction Services Agreement (General Contractor) (PCSA) and Pre-Construction Services Agreement (Specialist) (PCSA/SP) can be used with this contract.
This contract can be used with the Framework Agreement (FA).